Richmond Saleyards upgrade (QLD)

Project Scope
Upgrade of outdated weighbridge and control process to enable a higher flow of stock through the weighing facility.

Services Provided
- Removal of existing weighbridge, infrastructure around weighbridge and civil preparation of project area.
- Supply, installation and commissioning of new 12 x 3 meter concrete infill weighbridge with digital loadcells.
- Fabrication and install of new fencing and weighbridge approach infrastructure.
- Fabrication and installation of new guillotine gates, hydraulic controls and hydraulic pump.

Outcome
- Increased efficiency with stock flow through the weighing process increased by 50%
- Weighbridge designed with ease of ongoing cleaning and maintenance in mind.
- Higher lift guillotine gates installed reducing the risk of incurring damage via contact with animals and enabling ease of machine access for both cleaning and calibration work.
- Ongoing service provision for both weighbridge and hydraulic control system.

BEFORE


AFTER